Installing toilets with their hands

Ceramic toilets set on concrete or tiled floors and fastened with dowels, screws or by gluing to the floor. Between the floor and the toilet lay rubber sheet with a hole for the passage of the direct release of the toilet. It is also possible to mount the toilet screws taffeta - a wooden board with a hole for the socket embedded in the concrete.

Installing toilets with their hands

Plate toilet with an oblique issue and vysokoraspolozhennym cistern:

1 - waterproofing
2 - plug
3 - conduit
4 - valve
5 - the screw

  Installing toilets with their hands

The toilet set as follows. Graduation process with external grooves smeared diluted in drying oil and red lead him tightly wound resin strand. When winding strand is not the end of the process is adjusted to 3-4 mm to the ends of it were not included in the opening process and not caused the blockage.

Then the top coat with a strand of red lead and set the toilet discharge appendage into the socket. Toilet verified the installation, it is screwed to the dowels with screws. The screws have to be screwed careful not to chip the edge of the bowl, attached to taffeta, screws lubricated with grease before screwing. Under the screw head enclose a piece of leather or rubber and metal washer.

Cistern installation hang up the toilet by two screws. The screws on the wall in reinforcing dowels so that the tank was flat. Before installing the cistern to him on the floor attached discharge tube diameter of 32 mm. The other end of the discharge tube is coated with red lead and wrapped with linen threads which are coated with red lead from the top, too. At the end of the tube wear rubber cuff, which attaches to the pipe a thin wire. The other end of the cuffs wrench and pull the pipe.

The wooden seat is bolted directly to the toilet. To the underside of the seat screw Rubber buferki that protect against damage from a toilet seat falling.

Installation poppet Direct toilet bowl outlet release must be connected directly to the branch pipe socket which has to be removed flush with the floor.

Set bowl plate with an oblique issue and vysokoraspolagaemym toilet cistern and accession to the water and sewer risers located in the sanitary blocks, or risers located in the furrows of the wall shown in Fig. WC is set in accordance with mounting dimensions shown in the drawing.

Set bowl plate with an oblique release at 30 & deg; and extended shelf directly connected to the cistern " CD " shown in Fig. Cistern is fixed on elongated toilet shelf with two screws. For toilet privertyvajut special fittings for securing seats.

Installing toilets with their hands

Installation plate with low-toilet cistern

Belleville toilets with the release at 30 & deg; It can be connected to the sewer network in two ways. One way, when the toilet is connected to the two-plane tee, which is part of the sewer standpipe. Another method consists in the fact that the toilet bowl to the sewer network joins via transition tee being part flowline. In the latter case, the toilet set with slope from the sewer riser.

The toilet can be installed to seal the branch pipe above the floor is open or baseboard.

For fixing toilets to the tiled and concrete floors are widely used epoxy glue. Glue is applied to the bearing surface of the metal bowl shovel in four places at the corners in such a way that the total bonded surface was not less than 20 cm 2 . Layer thickness of adhesive should be 4-5 mm. Then the bowl is mounted on the floor and close to it is pressed. To provide the necessary adhesive strength, toilets must be at rest for at least 10-12 hours.

The surfaces are prepared for the installation of toilets using electrified tool. During the processing of this tool on the prepared surface roughness corundum stone is applied, which promote better adhesion toilets.

When using an epoxy adhesive is necessary to perform the following safety rules: the room in which the charge is made of pipes should be equipped with forced ventilation with triple air exchange; in areas where using an epoxy adhesive, is not permitted to store and meal; when working with the adhesive is necessary to use protective hand creams, rubber gloves or mittens.

After contact with skin glue hardener or finished, the affected area should be cleaned with acetone and then rinse with warm water. At the end of glue, as well as during a break in the work, you must wash your hands with warm soapy water.