Profession plumber we associate tend to shun kind man, ready for a bottle to make a " all-key ". Such associations have developed through many years of neglect of cultural production and moving away into the background of people's needs. In fact, the profession is a plumber in construction is not the last in importance.
Few people know, but there are special institutions of higher education to train the profession. The range of tasks that address these universities, of course is much broader than the issues that arise in the repair and decoration. Work at the site plumber usually begins and ends with the last first.
Plumbing equipment
It begins with the dismantling of the old equipment. If it is an old house, it is likely that some burst pipe or faucet picks, so you should be extremely careful in the production of equipment dismantling. In new houses, this process easier, as a rule, there is nothing to dismantle, because there is no equipment. Then, replacing radiators. The next time you come to the plumbing facility after construction and plastering the walls in the bathrooms. Makes installation of water pipes and sewage systems, all these pipes are mounted in the walls. At this point, the facility should be complete in the installation drawings installed equipment, the presence of fastening on mounting frames Built-in plumbing, heated towel rail.
The next step - setting the plumbing , the work is done before the finish varnishing parquet. The most common material for water - a metal and plastic. It is suitable for installation requires no welding, no deposition of plaque on the walls of the tubes. The company has a manufacturer warranty for these pipes 80 years of operation, but unfortunately, there is no statistics on this stuff, because it is fairly new. Also, copper pipes are used, the characteristics of which are similar to metal and plastic, but has operating statistics. The cost of copper pipe and accessories to them, about 1.5 times higher than that of metal and plastic. Sewer PVC pipes laid.
Plumbing
Plumbing at the facility are among the most expensive since These works belong to the category of hidden and the cost of failure is very high. Very often the customer insists on the " wrong " placement of plumbing fixtures for the sake of design space or unwillingness to contemplate the toilet at the entrance to the bathroom, although this room is isolated and can not be considered as open or as part of any premises. Because of this we have to build a variety of catwalks, pumps, and others. Contrivances, not to violate the laws of physics, and that the water from the toilet left in the main riser sewer, not the bidet, which by virtue of design solutions is below the toilet and close to the main riser sewer . Sometimes it is worth considering that the better the normal functioning plumbing or subjective view on the design of bathrooms. Very often, if not properly placement of plumbing and too large tracks of sewer pipes, there is a blockage of the tubes, which in this arrangement is very difficult to clean.